Consultancy Services for the Engineering Design and Construction Supervision of Engineered Landfill for Greater Accra Metropolitan and Material Recovery Facility

GhanaTenders notice for Consultancy Services for the Engineering Design and Construction Supervision of Engineered Landfill for Greater Accra Metropolitan and Material Recovery Facility. The reference ID of the tender is 95492987 and it is closing on 29 Feb 2024.

100% Secure Payments

Tender Details

  • Country: Ghana
  • Summary: Consultancy Services for the Engineering Design and Construction Supervision of Engineered Landfill for Greater Accra Metropolitan and Material Recovery Facility
  • GHT Ref No: 95492987
  • Deadline: 29 Feb 2024
  • Competition: ICB
  • Financier: African Development Bank (AfDB)
  • Purchaser Ownership: Public
  • Tender Value: Refer Document
  • Notice Type: Tender
  • Document Ref. No.: GASSLIP/S/013/2021
  • Purchaser's Detail :
  • Purchaser : THE MINISTRY OF SANITATION AND WATER RESOURCES
    Attn: The Project Coordinator Greater Accra Sustainable Sanitation and Livelihoods improvement Project (GASSLIP) Box MB 201, Accra, GASSLIP Offices Kwame Nkrumah Circle Ring Road West, Opposite Awudome Cemetery (Accra Sewerage Offices) Tel: +233-302234944/302 228791
    Email :gasslipmswr@gmail.com

  • Description :
  • Tenders are invited for Consultancy Services for the Engineering Design and Construction Supervision of Engineered Landfill for Greater Accra Metropolitan and Material Recovery Facility Specific objectives (Design Phase): i. To review current literature (sample design, design guidelines, procedures, reports, etc.) and legal framework, reforms and policy requirements related to waste processing center and Engineered Landfill designs. ii. To conduct all required surveys and investigations including, but not limited to, topographical survey, geo-technical investigation, soil investigation, hydrogeological investigation, meteorological investigation, identification of underground utilities etc. iii. To conduct detailed Engineering Surveys and Designs of various processing facilities like Composting unit with leachate collection system, enclosed inorganic waste recovery center (with autonomous facilities of feeding conveyor, sorting platform, sorting conveyor, reversible belt conveyor, automatic press for compaction/packaging), residue management facilities, access road, internal service road, storm water diversion drainage and other required infrastructures etc.) Including civil, mechanical and electrical components of waste processing based on best international/national practices in identified places within the various spots. iv. To conduct detailed Engineering Surveys and Designs of leachate treatment plant facilities for Engineered Landfill for all types of waste for safe disposal. v. To conduct environmental samplings and studies relevant to the waste management facilities and designs. vi. To conduct socio-economic survey relevant to the waste management facilities and designs. vii. To develop the most cost-effective design concept to address environmental and social impact mitigation requirements, viii. To prepare engineering drawings and cost estimation for Material Recovery Facility Center and Sanitary/Engineered Landfill. ix. To prepare technical specifications, operating manuals, health and safety plans. x. To prepare Environmental and Social Management Plan 2.2. Specific Objectives (Construction Phase) i. To ensure all construction activities/tasks are carried out timely by all contractors as stated in their contracts. ii. To supervise and ensure quality of work, standards and specifications as well as installation of equipment and supply of materials. iii. To monitor site layout plan and provide progress report (photos, data, videos, maps, drawings, etc) on field works and construction activities on sites. iv. To review the performance of the contractors and make recommendations to the Client for consideration. v. To provide prompt solutions to address field/sites challenges/issues and address related performance of the Contractors, MMDAs, Communities, Concern Groups, other interested Parties/Stakeholders. vi. To make a presentation on monthly or quarterly progress of work on construction activities of the assignment. 2.3. Specific Objectives (Post Construction Phase) i. To monitor, evaluate and submit full report capturing all post construction phase activities of the project including resolutions to complains and lessons learnt. ii. To prompt and ensure that all contractors have completed various tasks/corrections during the defect liability period including submission of final report (end of project report) to GASSLIP/MSWR/AfDB for approval. iii. To prepare Monitoring Plan with Institutional Model for Operation, Maintenance and Monitoring.
  • Documents :
  •  Tender Notice

If you are registered member, kindly login to view full details of this tender notice:

CLICK HERE TO LOGIN
GhanaTenders Features

GhanaTenders Features

Fresh and verified Tenders from Ghana. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.

  • 1,000+ Tenders
  • Verified Tenders Only
  • Accurate Tender Information
  • New Tenders Every Day
  • Consultants for RFI/RFP/RFQ
  • Search, sort, and filter Tenders
  • Customer Support
  • Publish your Tenders
  • Consulting Services
  • Export data to Excel or CRM

Get A Call From Tender Experts

Fill out the form below and you will receive a call from us within 24 hours.

Thank You for Contacting ZimbabweTenders !!
Email Id is already exist !!
Invalid Captcha !

Get FREE SAMPLE TENDERS from Ghana in your email inbox.

  Chat with us